• Cambridge University Cambridge

    Work on the resurfacing of the University Hockey Surface at the Wilberforce Road Sports Ground has been completed.

    Read this case study
  • Southgate Hockey Club Hertfordshire

    Blakedown Sport & Play are very proud to have been involved with the refurbishment of the two existing pitches at Southgate Hockey Club in Hertfordshire.

    Read this case study
  • Goals Soccer Centres UK

    Blakedown Sport & Play are proud to have worked with Goals building new facilities, resurfacing, regenerating and maintaining centres across the UK for the last 9 years.

    Read this case study
  • Brockwell Park Gardens London

    Following a successful tender process by Lambeth Council Blakedown Landscapes were appointed as landscape contractors for the first phase of the major re-development project at Brockwell Park Gardens in South East London.

    Read this case study
  • Anerley Vale London

    Blakedown landscapes have completed a large urban regeneration project on behalf of Affinity Sutton.

    Read this case study
  • University of Birmingham Birmingham

    The University of Birmingham already had some of the best facilities of any redbrick institution in the UK, but the artificial rugby pitch it commissioned Blakedown Sport & Play to construct was the icing on the cake.

    Read this case study
  • Charters, Ascot Berkshire

    Blakedown Landscapes have completed soft landscaping works at the prestigious development Charters in Ascot, Berkshire.

    Read this case study
  • Darwin Centre, Natural History Museum London SW7

    In this high-profile project, as part of the Natural History Museum’s new, state-of-the-art Darwin Centre, Blakedown constructed an external courtyard with a striking elliptical amphitheatre, a large, paved area for functions and a tree grove.

    Read this case study
  • Queen Elizabeth II Stadium Enfield

    Blakedown Sport & Play was pleased to play its part in the refurbishment of a facility that had once helped the likes of Sebastian Coe and Steve Ovett race to victory.

    Read this case study
  • St Mary’s Churchyard London SE5

    Winner of a prestigious BALI award, this project to regenerate St Mary’s Churchyard, in London’s Elephant & Castle, transformed the site from a grassed area, intersected by footpaths, to an attractive community park with playground.

    Read this case study
  • Nags Head Estate London E2

    Blakedown Landscapes have been shortlisted for the BALI National Landscape Awards, 2010, for their recent work on the Nags Head Estate in East London.

    Read this case study
  • Brunel University Uxbridge, West London

    The forthcoming 2012 Olympics provided a boon to Brunel’s already renowned sports facilities. The University, which has a long history of producing medal-winning athletes, was chosen as a training camp for Olympic sports teams, and a government fund enabled the facilities to be brought up to the highest international standards.

    Read this case study
  • Dauntsey’s School Wiltshire

    There were certainly jolly hockey sticks and players after Blakedown Sport & Play installed a new artificial hockey pitch at the independent co-ed school in Dauntsey, near Devizes, which is renowned for its sporting achievements. In fact, one of its key players, Emma Channon, recently represented West of England Hockey (Wessex Leopards) in the U16s category.

    Read this case study
  • Alexandra Palace Park London N22

    Blakedown drew on every aspect of its teams’ expertise to carry out a major refurbishment of London’s 200-acre Alexandra Palace Park. Over the course of nearly three years, all the main areas and attractions were overhauled and new facilities were built.

    Read this case study
  • Tunbridge Wells Grammar School for Boys Kent

    An all-out fundraising effort by staff, pupils, parents, governors and alumni went into making the dream sports facilities at Tunbridge Wells Grammar School a reality. Kent County Council loaned the school the funds to cover the construction but, to keep costs down, all those involved in the school were invited to support the endeavour, making it a real community achievement.

    Read this case study
  • William Brookes School Shropshire

    William Brookes is the first secondary school in Shropshire to be completely rebuilt. As part of the £23m build, Blakedown Sport & Play has been contracted to construct the outdoor, all-weather and natural sports facilities, which need to be tough enough to withstand use by over 1,000 pupils.

    Read this case study
  • Crawley Skatepark Crawley

    Building a skatepark requires specialist skill and precision — obviously the smoothness of the run is of paramount importance, both for performance and safety which Blakedown prides itself in achieving.

    Read this case study