Contracts

Queen Elizabeth II Stadium



The refurbishment saw the existing 8 lane track reconstructed to provide a high specification 6 lane sandwich system and associated field facilites.

Lord Coe, when he declared the track officially open said: “All my preparation for the 1984 Olympic Games (when he won gold in the 1500m) was in this borough and on this track. The track is better now than it is ever has been thanks to the upgrade by Blakedown Sport and Play”.

Contract Value: £500,000

Contract Duration: 16 weeks

About Us - Products - Contracts - News - Contact Us

Registered Number: 4413186