|
|
Tipton Sports Academy
Blakedown Sport & Play were employed by the Sandwell Leisure Trust to complete a resurface project at Tipton Sports Academy. [Detail]
|
|
|
|
|
|
|
Monkmoor Campus
Blakedown Sport & Play were employed by Moss Construction to install a 61 x 41.7m 3rd generation MUGA. [Detail]
|
|
Birmingham University
Blakedown Sport & Play are in the middle of constructing a new build 120m by 70m 3rd generation rugby pitch at Birmingham University. [Detail]
|
|
Stratford Football Club
Blakedown Sport and Play were employed to construct a 3rd Generation pitch using a Tiger Turf Football 50 carpet installed onto a dynamic base. [Detail]
|
|
Hereford Leisure Centre
Herefordshire Council employed Blakedown Sport and Play to resurface their exisiting pitch with a FIH approved sand-dressed carpet. [Detail]
|
|
Redhill School, Wolverhampton
Blakedown Sport and Play have completed work at Redhill School to construct a full size artificial 3rd generation football pitch for Dudley Borough Council and the Football Foundation. [Detail]
|
|
|
|
Moulton College, Northampton
Blakedown installed a full size 3rd generation long pile artificial pitch with rubber crumb infill complete with floodlighting system. [Detail]
|
|
Goal Soccer Centre, Leicester
Blakedown Sport and Play designed and constructed 12 synthetic five-a-side pitches using Edel Nature 3rd Generation long pile carpet with sand and rubber crumb. infill [Detail]
|
|
|
|
|
|